All The Way : Long Lead Tease – HBO

HBO has released a teaser of a new film All The Way. This is an adaptation of the Tony Award winning show of the same name and Bryan Cranston(Breaking Bad) is reprising his Tony award-winning role as Lyndon B. Johnson. A political drama look at the president taking over the White House after John F. Kennedy assassination. Caught between on the cusp of the enactment of the Civil Right Act spear headed by Dr. Martin Luther King Jr. (Anthony Mackie Falcon of Captain America: Civil War) and the wavering support of southern Democratic Party who brought Johnson to power during the first year of the tumultuous political career of his presidency. All The Way is also executive produced by Steven Spielberg as well as Bryan Cranston. Other cast include Bradley Whitford (The West Wing), Melissa Leo (The Big Shot, Wayward Pine), Frank Langella (The Americans, Frost/Nixon) and Stephen Root (Broadwalk Empire, No Country For Old Men). All The Way will premier on HBO May 21st at 8 pm. Check out the trailer below.


A tv geek and infotainment junkie.